Repsol

Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds Tier III level (Uptime Institute), with capacity to accommodate 16 racks in an environment with precision air conditioning, UPS regulated power, fire systems, backup generators and biometric access control mechanisms (Year 2011).

Cotas

Implementation of the first new generation CMTS nodes (cBr-8) simplifying the traditional CMTS model to a future CCAP (Year 2016).

CRE

Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)

Entel Financial

Perimeter security equipment, support services, management and monitoring (Year 2017)

Yguazu Cement

Multi-platform backup and recovery system in virtual libraries with online deduplication and compression by two EMC2 DATADOMAIN 160 systems (Year 2013-2017)

Bolivia

ITC Group logo

Santa Cruz

La Paz

Cochabamba