Success Stories
Telis
VSP G200 storage system on a mix of high performance and high capacity disks, connected to Cisco UCS servers and a VMWare environment (Year 2018)
Banco Mercantil Santa Cruz
Design, assembly and adaptation of a 150KVA "Tier III" Datacenter, segmented into Equipment, Network, UPS, Power, NOC, Test and Supplier rooms. Includes a Precision N+1 Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020)
Entel Financial
Perimeter security equipment, support services, management and monitoring (Year 2017)
ITC
Implementation of the second phase of the most reliable and robust private data center in the country (to date with 100% uptime in all its systems) with a capacity of 80 racks, 2(N+1) energy and thermal redundancy (N+1 in each room), high levels of security, transfer to the new power plant without interruption of service and maintaining operation 7x24x365, operators' room, policies, processes and procedures (Year 2016-2017)
Cotas
Implementation of the first new generation CMTS nodes (cBr-8) simplifying the traditional CMTS model to a future CCAP (Year 2016).
Social Welfare Institute of the Republic
Corporate storage solution for PACS medical diagnostic imaging platform (Year 2013-2018)