Construction of 350 sites (Technical Rooms) in 9 phases, including cooling, power, fiber and copper cabling, rack mounting, power regulation, up to switch configuration (Year 2013 -2016)

Entel

Construction and adaptation of 130 sites (technical rooms) outdoor and indoor (Radiobases) that house Cisco, Huawei and Ericsson equipment. Project that includes air conditioning, power, racks and cabling at each site.

DGIC Ministry of Finance

Consultancy for the study of the investment project for the construction of a Data Center for the Ministry of Finance of the Government of Paraguay. Analysis, studies, design and assembly of a 1000 mts2 Datacenter complying with the Telecommunications Industry Association (TIA-942), ISO 14000, ISO 17799/27001 and the BCI ("Business Continuity Institute") standards.

Secretary of State for Taxation (SET)

PROFOMAF II 240 BR-PR IDB PROJECT for the Adequacy of the current Data Center and Design of a new Data Center for SET. Analysis, studies, design and assembly of a 1000 mts2 Data Center complying with the Telecommunications Industry Association (TIA-942), ISO 14000, ISO 17799/27001 and the BCI ("Business Continuity and Business Continuity of the Data Center") standards.

CRE

Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)

Repsol

Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds Tier III level (Uptime Institute), with capacity to accommodate 16 racks in an environment with precision air conditioning, UPS regulated power, fire systems, backup generators and biometric access control mechanisms (Year 2011).